Basic Info.
Dispersion Medium
Water Base Steel Structure
Fire Prevention Mechanism
Non-Expansion Steel Structure
Use
Fireproof Coatings For Steel Structures
Type
High-Temperature Adhesives
Refractory Temperature
Over 2000 ºC
Material
Organic Resins and Inorganic Polymer Materials
Transport Package
25kg/Barrel
Specification
fireproof paint
Product Description
Product Description
Product Introduction:
The execution standard for outdoor non expansion steel structure fireproof coating is GB14907-2018, which is a similar product to the execution standard GB14907-2002 for outdoor thick steel structure fireproof coating. The principle of fire resistance and thermal insulation of this coating: When the fireproof coating is exposed to fire, the coating basically does not change in volume, but the thermal conductivity of the coating is very low, which delays the speed of heat transfer to the protected substrate. The coating of the fireproof coating itself is non combustible, acting as a barrier and preventing thermal radiation on steel components, avoiding direct attack of flames and high temperatures on steel components. In addition, some components in the coating react with fire to generate non combustible gases, which is an endothermic reaction and consumes a large amount of heat, which is conducive to reducing the system temperature. Therefore, the fireproof effect is significant, providing efficient fire and thermal insulation protection for steel. When the coating of this product is exposed to fire, it changes to form a glaze like protective layer, which can isolate oxygen, making it effective in preventing fire and thermal insulation. Oxygen cannot be in contact with flammable substrates that are protected, In order to avoid or reduce combustion reactions, thick coated non expanding fireproof coatings are excellent modern steel structure insulation fireproof coatings.
It has the following characteristics:
☆ People oriented, green and environmentally friendly, this product is a fireproof coating that has passed the China Environmental Labeling Product Certification.
☆ Early production time, mature process, reasonable formula, and excellent weather resistance.
Excellent fire resistance, withstanding the test of the fire at the Dongfang Ethylene construction site.
☆ Widely applicable, such as the fire prevention and insulation of beams and columns of outdoor steel structure frames in train stations and petrochemical enterprises, as well as the fire prevention and insulation of steel pipelines, and also suitable for the fire prevention treatment of indoor steel structures.
Due to its characteristics of non corrosive steel, no chemical reaction with any anti-corrosion primer, no irritating odor, light coating weight (relatively light structural load weight), large unit coating area, no smoke generation when exposed to fire, and no release of harmful gases, this product is suitable for fire protection of steel structure surfaces in auditoriums, cinemas, hotels, hospitals, office buildings, shopping malls, as well as factories, warehouses, and various industrial and civil buildings in industries such as petrochemicals, transportation, electronics and telecommunications, and mechanical manufacturing.
The models are divided into: GT-WSF-Fp2.5-F06
GT-WSF-Ft3.00-HBBH
GT-WSF-Ft2.50-HBBH
Performance indicators:
NO, | ITEM | TECHNICAL INDEX |
1 | State in container | After stirring, it presents a uniform and thick fluid state without clumping. |
2 | Drying time (surface drying), h | ≤24 |
3 | Initial drying crack resistance | 1-3 cracks are allowed, and their width should be ≤ 0.5mm. |
4 | Bond strength, Mpa | ≥0.04 |
5 | Compressive strength, Mpa | ≥0.5 |
6 | Dry density, (kg/m3) | ≤650 |
7 | Acid and alkaline resistance (h) | After 360 hours of testing, the coating should have no peeling, peeling, or cracking phenomenon. And the reduction in insulation efficiency should be ≤ 35% |
8 | Resistance to freeze-thaw cycles (times) | After 15 tests, the coating should have no cracking, peeling, or bubbling. And the reduction in insulation efficiency should be ≤ 35% |
Fire resistance time :Fire resistance time | FP2.5h | FT3.0h | FT2.5h |
Coating thickness | 26mm | 38mm | 33mm |
Construction method:1, Grassroots treatment: Before construction, thoroughly remove dust, oil stains, and floating rust from the steel parts to be sprayed, and apply alkali resistant and rust resistant primer.
2, Bottom construction method:
When applying fire-resistant coatings on I-beams, H-beams, and rectangular steels with a width of less than 300mm, the base material can be roughened before the fire-resistant coating can be applied.
When applying fire-resistant coatings on I-beams, H-beams, and rectangular steels with a width of less than 300mm, mesh treatment is required before the application of fire-resistant coatings. Steel plate mesh or metal mesh can be selected, and fixed with welded steel bars or bonded insulation nails.
3, Construction of Fireproof Coatings
1. The construction of the first layer of fireproof coating is carried out by adding a powder: glue: water ratio of 3:1:2 (the ratio of powder and glue can be adjusted appropriately according to the construction site situation). The matching glue of the fireproof coating and an appropriate amount of water are fully mixed, and the construction should be carried out by spraying. The coating thickness is generally below 5mm.
2. Spray the first layer of fireproof coating when 70-80% is dry (about 24 hours later); If the bottom layer is relatively dry, water can be sprayed first to moisten it before proceeding with the construction of the second layer, starting from the second layer. The construction thickness of each layer can be between 8-10mm until it reaches the fireproof design thickness, and the construction can be carried out by spraying or wiping.
3. During interlayer construction, the surface of the fireproof coating should not be smooth and can be made into a rough surface, which is conducive to the bonding of the upper and lower layers.
4. When constructing the top of the equipment skirt and steel structure, a slope of 30 ºC -45 ºC should be made for the fireproof coating. After the coating is dry, the top of the slope must be sealed with outdoor sealant.
5. When constructing fireproof coatings for thick steel structures in summer, it is necessary to prevent the coating from drying too quickly, causing cracking or hollowing of the coating. The coating should be properly cured in a timely manner.
Maintenance method: Wrap the coating with plastic film to control the surface drying time. When scraping the rough or intermediate layer during construction, an appropriate amount of reinforcing agent can be added, with a ratio of 5% to 8% of the powder. Prevent direct sunlight from shining on the coating, sprinkle appropriate water on the coating surface to control the drying time of the coating surface, and reduce the cracking or hollowing phenomenon and range of the coating.
6. During winter construction, thick steel structure fireproof coatings should be anti freezing and prevent the coating from freezing before drying. The construction environment temperature should be above 5 ºC, and attention should also be paid to the construction time period.
7. Precautions:
1) The construction environment temperature should be between 5-35 ºC, and the relative humidity should not exceed 80%. When there is rain or condensation on the surface of components, the wind speed is greater than 5m/s, and it is not suitable to work. Before each construction coating is dry, avoid rain.
2) The material prevents moisture and rainwater from entering, and if it becomes damp, it will become ineffective.
Packaging and Transportation:2. Outdoor non expansion steel structure fireproof coating. This product is packaged in woven bags lined with plastic bags, with a weight of 25kg per bag. It should be stored in a well ventilated, dry warehouse with a temperature above 0 ºC.
2. This product is a non combustible, non explosive, non-toxic, and non corrosive safety product for outdoor non expansion steel structure fireproof coatings. During storage and transportation, attention should be paid to moisture-proof, sun proof, rain proof, and powder materials that are prone to water and clumping should not be used.
3. Outdoor non expansion steel structure fireproof coatings are non hazardous products and are transported as general materials. The storage time of this product should not exceed 6 months.
4. During transportation, it is necessary to prevent rain, direct sunlight, and hooks, and to comply with the relevant regulations of the transportation department.
Hot Products
Company Profile
Packaging & Shipping
FAQ
Q1, Are you manufacturer or trading factory?
A: In fact we are the factory more then 10 years, can supply all types of paint.
Q2, If the OEM is accepted?
A: Yes, OEM is welcome. We also can do your own logo and package.
Q3, If I do not know which paint to choose, what shall I do?
A: Please no need to worried about this, we have the professional engineer, colorist, and experienced sales, can give you the suggestion for paint and coating.
Q4, What's are your payment term?
A: We can accept the TT, Western Uniono, LC, Credit card, and Alipay, and others please contact with us freely.
Q5, Can you accept to supply the free sample?
A: Yes, of course we are glad to supply the free sample, and you need in charge of the freight cost.
Q6, What's your products' advantages?
A. Good quality and competitive prices.
B. Strictly quality control when producing.
C. Professional team work, from design, development, producing,assemble,packing and shipping.
D. Experience for shipping the paint to different countries.
Q7, Can we visit your factory?
You are Warmly welcomed to visit our factory, it would be our great pleasure!
Address:
Dadameng Bridge village, Guang ′an Town, Dacheng County, Langfang City, Hebei province
Business Type:
Manufacturer/Factory
Business Range:
Chemicals, Construction & Decoration
Management System Certification:
ISO 9001
Company Introduction:
Hebei Baohang Fireproof Materials Co., Ltd. is the development, production and management of fireproof materials technology
Economic entity, with domestic leading production facilities and inspection equipment. The company has a technical department,
Production Department, Quality Inspection Department, Enterprise Management Department, after-sales Service Department, Marketing Department, Financial Department,
The Human Resources Department has passed ISO9001: 2015 quality management system certification and national elimination
Anti-product certification, strict quality system to ensure our products of high quality and high stability.
Our products are now 5 series of 30 varieties, have been sold to Shandong, Beijing, Tianjin,
Hebei, the three Eastern Provinces, Inner Mongolia, Xinjiang, Gansu, Ningxia, Shanxi, Anhui, Guizhou, Hubei,
Hunan, Chongqing, Guangdong, Guangxi, Fujian and other more than 20 provinces and autonomous regions, the main fire prevention department
The list products are: Fireproof blocking material, fireproof bag, steel structure fireproof coating, cable fireproof coating, prevention
Fire belt, fire partition, fire block module, explosion-proof cement, cable trough, ventilation duct, etc.
Leading products enjoy a high reputation in China. All products have been approved by the People′s Republic of China
Emergency department of fire products conformity assessment center strict review, and passed the fire products evaluation center
The inspection of accredited quality supervision and inspection center, fire resistance and main performance indicators have reached the national level
Home related standard provisions.
"Based on the local, focus on the whole country; Technology first, develop new products; Update, high quality
"Efficiency" strategy is the consistent pursuit of Baohang, the company′s concept is to create a good national industrial mouth
Tablet, I believe that "Treasure Hang" will be in the care of colleagues from all walks of life with more passionate enthusiasm to create
More brilliant performance.